Thursday, September 22

Group 1, Group 2, Group 3
08:00 Transfer from Tallinn to Auvere; pick up in front of Tallink Spa & Conference Hotel, Sadama 11
11:00 Arrival at Eesti Power Plant, refreshment break
11:30 Presentations of Enefit – Mines, Power Generation, Oil and Gas
13:00 Lunch

Group 1
14:00 Transfer to Auvere Power Plant
14:15 Tour at Auvere Power Plant
15:30 Tour at Enefit280
16:45 Transfer to the Noorus Spa Hotel
19:00 Group Dinner at Noorus Spa Hotel

Group 2
14:00 Transfer to Enefit280
14:15 Tour at Enefit280
15:30 Tour at Auvere Power Plant
16:45 Transfer to the Noorus Spa Hotel
19:00 Group Dinner at Noorus Spa Hotel

Group 3
14:00 Transfer to Narva Open Cast Mine
14:30 Tour at Narva Open Cast Mine
17:00 Transfer to the Noorus Spa Hotel
19:00 Group Dinner at Noorus Spa Hotel
Friday, September 23

Group 1
08:00 Transfer from hotel to Narva Wind Park
08:30 Tour at Narva Wind Park
09:00 Transfer to Narva Open Cast Mine
09:30 Tour at Narva Open Cast Mine
11:45 Transfer to Tallinn, light meal on the bus
15:00 Arrival in Tallinn, in front of Tallink Spa & Conference Hotel, Sadama 11

Group 2
08:00 Transfer from hotel to Narva Wind Park
08:30 Tour at Narva Wind Park
09:00 Transfer to Narva Open Cast Mine
09:30 Tour at Narva Open Cast Mine
11:45 Transfer to Tallinn, light meal on the bus
15:00 Arrival in Tallinn, in front of Tallink Spa & Conference Hotel, Sadama 11

Group 3
08:00 Transfer from hotel to Narva Wind Park
08:30 Tour at Narva Wind Park
09:00 Transfer to Auvere Power Plant
09:30 Tour at Auvere Power Plant
10:30 Transfer to Enefit280
10:45 Tour at Enefit280
11:45 Transfer to Tallinn, light meal on the bus
15:00 Arrival in Tallinn, in front of Tallink Spa & Conference Hotel, Sadama 11

Come to Estonia for a unique opportunity to see the world´s leading oil shale industry

The Symposium offers a once-in-a-lifetime opportunity to visit the most prominent sites of the Estonian oil shale industry as well as to get insights into the operation of the companies. The number of participants will be limited on a first come-first served basis. We encourage those interested to sign up early!

Lectures and tours in the heart of the Estonian oil shale industry will include:

  • The unique shale oil, gas and electricity cogeneration plant Enefit280
  • The new 300 MW Auvere Power Plant based on state-of-the-art circulating fluidized bed technology using oil shale and woodchips for fuel
  • World´s largest oil shale open cast mining site
  • Presentations by, and an opportunity to meet and consult the management and experts of the companies operating the sites
  • Overnight lodging at a spa hotel (Thursday, September 22)
  • All meals and snacks, including a Field Trip Group Dinner
  • Transportation from Tallinn to Narva (Eastern Estonia), and back to Tallinn

Field Trip Fee: 300 EUR

Enefit280 Oil Plant 

38DZ6MFCThe field trip to Ida-Viru county will offer an extraordinary opportunity to see the unique shale oil, gas and electricity plant in operation, the Enefit280. Enefit280 has proven to have very low air emissions and high efficiency. The plant consumes 2.4 million tons of oil shale annually and produces 1.7 million barrels of shale oil, 75 million m3 of hydrogen rich retort gas and 200 GWh of electricity per year. Guests will have an unprecedented opportunity to meet and consult with the top management and experts of Enefit Oil and Gas and Enefit Outotec Technology.

 

Auvere Power Plant

_MG_0066The world´s largest oil shale fired power plant, Auvere plant is based on Alstom’s circulating fluidized bed (CFB) boiler technology and using local oil shale and biomass for fuel. The new plant will be commissioned in 2016 and it will supply the majority of the country’s domestic electricity consumption in full compliance with the latest and upcoming stringent European Union emission directives, thanks to the state-of-the-art technology. Additionally the higher efficiency of the new power plant will contribute to reducing CO2 emissions. The power plant is located near the town of Narva, near the existing two Narva power plants which have an installed electric capacity of 2,380 MW.

 

Narva Open Cast Mine

Enefit07The field trip will include the most extensive oil shale open cast in Estonia. Guests will get a unique first-hand experience of the mining, production and reclamation processes. The Narva Open Cast Mine has a production capacity of 6 million tons per year, the total annual production of the Enefit Mines is around 10 million tons.

 

Narva Wind Park

_MG_1791_1We will visit the Narva Wind Park, which was established in 2011. Enefit installed 17 wind turbines to the second ash field of the Balti Power Plant, which was closed and landscaped in 2008. The ash field, which had previously been used for the material left over from oil shale energy production, has become the foundation for the wind park. The total capacity of the first Narva Wind Park is 39 MW, and its annual electricity output is around 90 GWh. The renewable electricity produced by the wind power plant will be enough to meet the annual electricity needs of 35,000 average Estonian households in the future. Our tour bus will take the visitors right to the top of the ash field to enjoy the view of the surrounding areas.

 

NB! To register for the field trip, participants must also register to attend the symposium.

Field Trip Dress Code: casual, comfortable. Helmets (and boots in Narva open cast mine) will be provided.

 

Accommodation
Noorus SPA Hotel
L.Koidula 19d, 29023 Narva-Jõesuu, Estonia

Noorus Spa HotelNoorus Spa Hotel standart room

There are 114 comfortable rooms in Noorus SPA hotel. All rooms are non-smoking. Every room is equiped with a bathtub/shower, hair dryer, bathrobe, Cosmetic Dispenser Pumps, air conditioner, free wi-fi, TV, phone, safe and minibar. Reception open 24h.

Accommodation includes housekeeping, breakfast, aqua and sauna facilities unlimited use, gym use, children playroom, bathrobes, parking slot upon the availability.